期刊文献+

综采设备的十项改革

Modifications of face system
下载PDF
导出
摘要 叙述了该矿对综采设备的十项改革内容及收到的效果。 practical experience showed that although the face installation for fully mechanized face was rational in design and had good adaptability, if the. user did not modify it to suit local conditions its performance could not be brought into full play, Shigejie mine in Luan made satisfactory modifications of the face system introduced from poland. They included: 1. Use of limit screw to control the haulage speed of shearer; 2. Design of a ramp for loading powered support to shorten the time for withdrawal of supports; 3. Modification of connecting beam for push and pull powered support and AFC; 4. Manufacturing of fore-poling fixed on the roof beam; 5. Modification of belt reel; 6. Heat-treatment of picks of drum shearer; 7. Improvement of the layout of cable handler of shearer; 8. Improvement of connections between pan lines; 9. Change of lifting device for stage loader; 10. Protection of shaft of the delivery end of stage loader.
作者 郝中德
出处 《煤炭科学技术》 CAS 1988年第2期2-5,63-64,共6页 Coal Science and Technology
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部