摘要 总结西山矿务局各矿用木垛堆碴法和吊笼法施工各类反井发展到用钻井法施工反井的情况和技术经济比较。 the technique of shaft raising started from using conventional drill and blast method to using raise borer. A small diameter, 0217 mm, pilot hole is drilled by a raise borer downward. It is reamed upward to 1 m diameter. Then drill and blast method is used to enlarge the hole to the specified cross-section. When the finished diameter is not more than 2m, sometimes, it is enlarged by borer in one pass to the required diameter. Raise-boring embodies fast excavation. The monthly advance of finished shaft is 81 m. As compared with conventional method, the cost reduces by ahout 40%, Labour intensity is much less. It is a promising method.