摘要
基于开挖掘进时煤岩体易积蓄能够引发冲击地压的弹性能,其能量的积蓄与开挖时间及空间状况因素密切相关。为明确开挖工程时对影响弹性能积蓄的因素及主次关系,以城山煤矿"7·16"冲击地压事故为实例,分析确定了开挖时间、煤层上方采空区、顶板强度3个因素对于弹性能积蓄的影响,并利用FLAC3D数值模拟软件对能量进行计算和提取,得到了不同因素对于弹性能分布的影响程度。结果表明:以上3个因素均会对煤岩体中弹性能的积蓄产生影响,各因素对于能量分布的影响程度由大到小依次为煤层上方采空区、顶板强度、开挖时间,因此断定煤层上方采空区为该矿此次事故发生的主控因素。
Based on the excavation and heading period,the elastic energy accumulated in the coal and rock masses would initiate mine pressure bump and the accumulated energy value would be related to the excavation time and space. In order to define the factors and the primary and secondary relation affected to the elastic energy accumulation during the engineering excavation,taking the '7 ·16'Mine Pressure Bump Accident occurred in Chengshan Mine as a case,the paper analyzed and studied the three factors of the excavation time,the goaf above seam and the roof strength affected to the elastic energy accumulation. With the energy calculation and extraction,the FLAC3D was applied to obtain different factors affected the elastic energy distribution. The results showed that the above three factors all would affect the elastic energy accumulation in the coal and rock masses. According to the influence degree of the energy distribution by each factor,the sequence from high to low would be the goaf above coal seam,the roof strength and the excavation time,the goaf above coal seam were the main control factor of the occurred accident.
出处
《煤炭科学技术》
CAS
北大核心
2014年第4期31-34,共4页
Coal Science and Technology
基金
国家重点基础研究发展计划(973计划)资助项目(2010CB226801)
国家自然科学基金资助项目(51174213)
中国矿业大学煤炭资源与安全开采国家重点实验室开放基金资助项目(SKLCRSM11KFB07)
关键词
冲击地压
开挖时间
煤层上方采空区
顶板强度
主控因素
mine pressure bump
excavation time
goaf above coal seam
roof strength
main control factors