摘要
本文主要介绍了土钉墙支护技术方案 ,通过现场实验来进行方案优化的过程 。
In this paper the technical plan of anchored bulkhead in the construction of deep foundation is introduced first. Then, the optimizing process of the archored bulkhead througth the test on site is dicussed. Finally, the construction technology and the monitoring method of anchored bulkhead are proposed.
出处
《结构工程师》
2003年第1期67-74,共8页
Structural Engineers
关键词
土钉墙
支护
抗拔力实验
施工工艺
监测
design of anchored bulkhead, pull-out-test of anchor, construction technology, monitoring method