期刊文献+

多年调节水电站节水增发电量考核计算方法研究 被引量:21

A Study of Calculating Method for Evaluation of Multiannual Storage Plant Water Saving and Electric Energy Output Increasing
下载PDF
导出
摘要 黄河上游梯级联合调度以龙羊峡和刘家峡两库联合调节为原则 ,而龙羊峡电站节水增发电量考核不同于一般的年调节电站或径流电站 ,需以梯级联合运行调度图为依据 ,根据多年调节水库的特点 ,提出库存水量转换成电量的方法 ,将计算电量与库存电量之和作为考核电量。实例计算结果表明 。 The joint operation of the Yellow River upstream cascades is based on the principle of the united regulation of Longyangxia reservoir and Liujiaxia reservoir.The evaluation of Longyangxia water saving and energy output increasing is different from that of the normal annual storage plant and the run off river power plant so that it must depend on cascades cooperation dispatching charts. According to the characteristics of multiannual storage plant, this paper advances the method of changing water volumes stored in reservoir into electric energy so as to take the sum of calculated stored electric energy as checked electric energy.Accordingly,the results from the calculation of actual examples indicate that the method of multiannual storage plant water saving and electric energy output increasing is rational and feasible to be used in practice.
出处 《西安理工大学学报》 CAS 2002年第4期356-360,共5页 Journal of Xi'an University of Technology
基金 国家重点基础研究发展规划资助项目 (G1 9990 43 60 8) 国家自然科学基金资助项目 (5 0 0 790 2 1 ) 陕西省教育厅科研计划资助项目 (0 0 K1 3 8)
关键词 多年调节电站 龙羊峡电站 节水增发电量 考核 水电站 multiannual storage plant longyangxia hydropower plant water saving and electric energy output increasing evaluation
  • 相关文献

参考文献5

共引文献19

同被引文献77

引证文献21

二级引证文献82

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部