国际总承包项目是一个系统工程,而且周期长、风险大,从招标、签约以至到长时间的履约过程中,会出现各种各样的问题和意外,发生索赔在所难免。结合科威特集油站项目变更索赔的实践,简述了国际总承包工程索赔的成因、必然性及索赔的分类。文章着重介绍了科威特集油站项目的基本情况、项目的索赔工作、承包商与业主的索赔、总包商与分包商的索赔、总承包商与供货商的索赔等方面的内容。通过这次工程索赔实践总结了几点认识:工程承包是一项风险事业;尽量避免或减少对承包商不合理的风险性条款;全面理解合同条款,利用法律维护承包商权益;变更索赔是一项全过程的工作,承包商应充分重视。
World contract project always is a systematic project, and period length and risk are big, from public bidding, sign a contract and long time course of carrying out the agreement, there can arise various problems and accidents, it is unavoidable to occur claim. Combining Kuwaiti oil station practice of project claim, we have summarized the cause, certainty of international contracts claim. Article has emphatically introduced the aspects such as basic conditions of Kuwaiti oil station and the project claim work, the claim of contractor and owner etc. . Through this project claim practice, we have summarized the knowledge as follows: It is a risk cause that project is contracted; avoid or decrease risk of unreasonable contractor term as far as possible; understand contract terms, defend contractor rights and interests using law; working contractor should pay attention fully to change claim.
出处
《石油工程建设》
北大核心
2003年第2期35-40,共6页
Petroleum Engineering Construction
关键词
国际总承包工程
索赔
工程承包
成因
international project, contract claim, cause, content, experience