期刊文献+

墙下条形基础加固工程中静压桩的研究与应用 被引量:2

Application and Research of Static Pile in Strengthening of Strip Foundations Beneath Bearing Brick Wall
下载PDF
导出
摘要 工程实例表明 ,对墙下条形基础加固可灵活地安排静压桩的施工顺序 ,静压短桩 (桩长≤ 1 0m)的承载力可采用可靠的压桩力除以 1 5的系数得出。依据工程经验提出了墙下条形基础改成桩基础承台设计方案与静压桩静压力的施加方案。在砌体危房加固工程中 ,当软弱地基上墙下条形基础沉降过大时 。 On strengthening of strip foundations beneath bearing brick wall,it is pointed out that the order of construction of static pile is arranged freely,and that bearing capacity of static short pile is the equal of the reliable static pressure of pile which is divided by the coefficient 1 5.Design schemes of converting strip foundations beneath bearing wall into pile caps,and techniques of application of static pressure of static pile are proposed,which the technique of static pile modified on strengthening of strip foundation beneath bearing wall in dangerous masonry buildings should be adopted first of all when the settlement of bearing walls strip foundation on soft ground base is too much.
出处 《建筑结构》 CSCD 北大核心 2003年第4期52-54,共3页 Building Structure
关键词 墙下条形基础 软弱地基 加固 静压桩 施工 strip foundation bearing wall soft ground base strengthening technique static pile
  • 相关文献

参考文献6

二级参考文献1

共引文献8

同被引文献5

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部