摘要
介绍了循环流化床锅炉和鼓泡床锅炉的启动试验 ,总结了多台循环流化床和鼓泡床启动调试实际经验 。
It introduced the experiment practice in cold state test for the CFB and Bulbing Fluidized bed boilers' starting up preparation with some available commisioning procedure in different boilers.The writer analysed and resolved the troubles occurred in the real starting up tests for the boilers.
出处
《山西电力》
2003年第2期16-18,共3页
Shanxi Electric Power