凤凰山铜矿碎磨系统的现状及改造 被引量:1

Current Status and Improvement of Crushing and Grinding System in Fenghuangshan Copper Mine
原文传递
导出
摘要 The processing ability of mills has never satisfied the design requirements, unit power comsumption for grinding is very high, since Feng Huang Shan copper mine was put into operation thirty years ago. After field investigation, analysis calculation, the measures was taken that crushing system is keep current status, rob grinding system is stopped, the balls in ball-grinding mill are bigger than before, increasing comprehensive filling factor of the balls and rotating speed, so as to greatly improve the processing ability and power availability of3.2 ×3.1m ball-grinding mill [ The processing ability of mills has never satisfied the design requirements, unit power comsumption for grinding is very high, since Feng Huang Shan copper mine was put into operation thirty years ago. After field investigation, analysis calculation, the measures was taken that crushing system is keep current status, rob grinding system is stopped, the balls in ball-grinding mill are bigger than before, increasing comprehensive filling factor of the balls and rotating speed, so as to greatly improve the processing ability and power availability of3.2 ×3.1m ball-grinding mill [
出处 《矿山机械》 北大核心 2003年第4期26-27,共2页 Mining & Processing Equipment
关键词 铜矿石 碎磨系统 改造 砾磨机 球磨机 节能 Mill Impact Crush force Filling factor Rotating speed
  • 相关文献

参考文献5

二级参考文献7

共引文献53

同被引文献2

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部