摘要
本文介绍了测量GIS中隔离开关操作产生的快速暂态过电压的系统构成、准确度分析、使用该测量系统进行现场测量以及仿真计算的结果。
A measuring system for detrmination of transient over-voltage suddenly formed during the operation ofisolating switch in GIS is described in this paper.The acuracy of the system, the result of simulating computationand field practice are also presented.
出处
《华东电力》
1992年第6期1-4,共4页
East China Electric Power