摘要
介绍了西安绕城公路高架桥钢箱梁在制造安装中板块、I型块单元。
The paper introduced the control measures of welding deformation during the production and installation of plate and 'I' type block unit in the steel box beam used in the road viaduct around Xi'an city.
出处
《焊接》
2003年第5期35-37,共3页
Welding & Joining