结合某工程钢混连续结合梁施工实例,介绍了钢混连续结合梁在场地较平坦时钢梁吊装架设及混凝土面板一次现浇的施工方法,通过使用此法,缩短了工期,降低了工程造价,其经济和社会效益显著。
Combined with continuous steel-concrete composite beam bridge construction in Qinhuangdao-Sheriyang special railway line for passenger transportation the lifting and erection of steel beam and one cast construction method of concrete slab in continuous steel-concrete composite beam bridge construction are introduced. The application of this method reduced the engineering cost and limit time with obvious economic and social benefits.