摘要
以中铁十二局集团机关具体工程为例,针对大开间短肢剪力墙结构从模板设计、施工方案、混凝土浇筑到模板拆除及吊装全部施工过程进行了优化,确保了工程质量,缩短了工期,取得了显著的经济效果。
Taking the modification works in the 12th Engineering Bureau of China Railway as examples and combined with some related codes the underpinning method is used in new load-bearing system caused enlargement in bottom to solve the technical difficulties in design and construction and reduce time limit and engineering cost.
出处
《山西建筑》
2003年第5期64-65,共2页
Shanxi Architecture