摘要
以白龙山隧道涌水地段大坍方为例,分析了涌水造成隧道坍方的原因,阐述了坍方的处理过程,经坍方处理,该段再未发现开裂、下沉等不良现象,证明此法处理坍方有效。
Taking the collapse in water flush section in Bailongshan Tunnel as example the reasons cased the tunnel collapse are analyzed; at the same time collapse treatment process is elaborated. Through treatment there are no undesirable phenomena occurring such as crack and settlement.
出处
《山西建筑》
2003年第5期246-247,共2页
Shanxi Architecture