一种基于GPS的测量远动系统传输延时方法 被引量:1

A GPS-BASED MEASUREMENT OF SYSTEM TIME-DELAY IN RTU DATA TRANSMISSION SYSTEM
下载PDF
导出
摘要 在调度实用化验收和新建厂站的远动设备投产验收工作中,均需要测试厂站的模拟量变化和状态量变位至调度端的信息传输延时,用以检查该装置或系统是否达到技术标准。传统的人工电话同步测量方法已较落后,且缺乏科学性。文中介绍了一种利用全球卫星定位系统(GPS)接收装置和信号发生器组成的,并在主站端实施GPS同步的同步延时测量系统。该系统具有实用性强、准确性高的特点,可用于远动专项测试工作。 In the acceptance of the SCADA functions in control centre and that of the telecontrol equipments for newly built substation, the system time delay, i.e., from the time when the input signal has been changed to the time that the change is updated on the screen in control centre, should be measured to check whether the established SCADA or the equipments are satisfactory for technical specifications. Traditional artificial synchronous measurement of the system time delay via telephone is backward in technique. A new wide area synchronous time delay measurement system is presented in which the GPS receiving arrangement is combined with signal generator and the synchronization of GPS is carried out at the master station. This measuring system is accurate and practical.
作者 岑宗浩
出处 《电网技术》 EI CSCD 北大核心 2003年第5期47-50,共4页 Power System Technology
关键词 电力系统 GPS 全球卫星定位系统 同步延时测量系统 远动系统 信息传输 Remote Terminal Unit (RTU) SCADA Delay-time Measurement GPS
  • 相关文献

参考文献1

  • 1.华东电网时间同步系统技术规范.国家电力公司华东公司企业标准[S].,2002..

同被引文献8

引证文献1

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部