摘要
本文介绍了火力发电厂直接空冷系统性能试验的基本过程,对VGB导则进行了释义,并对A电站性能试验的结果进行了分析,最终提出了一些改进的建议。
The basic processes of the direct air-cooled performance testing in power station were described,and guidelines for the VGB were interpretated,and the results of A power station performance test were also analyzed,finally we put forward some suggestions for improvement.