国勘公司某海外地面建设项目如何做好HSE管理

How a overseas Field development project promote its HSE management
下载PDF
导出
摘要 国勘公司某地面工程建设项目,作业类型繁杂,作业人员众多,交叉作业十分频繁,给安全管理工作带来了诸多挑战。项目通过过程安全管理预防重大事故;采用HSE审计为抓手,预防投产前HSE风险;深入调查事故根原因,推动HSE文化提升,严控交叉作业风险,实现项目HSE绩效持续不断提升。经过三年,项目的损失工时事件发生率(LTIF)从2013年的0.67下降至2016年的0,可记录事件发生率(TRIR)从2013年的2.57下降至2016年的0.54,HSE绩效提升显著。 One of Sinopec International Petroleum Explosion and Production Corporation(SIPC)oversea field development and production project faces with serious HSE situation,complicated operation,thousands of employees and contractors,thousands of simultaneous operation and etc.The project adopt process safety to prevent major accident,A HSE audit as an effective measure to control pre-stat up risk,and promote incident prevention by incident root cause analysis.From 2013 to 2016,Lost time injury frequency(LWDC)dropped from 0.67 to zero in 2016,Total Recordable incident rate(TRIR)lowered from2.57 to 0.54.The project HSE performance improved dramatically.
作者 马娟
出处 《内蒙古石油化工》 CAS 2018年第3期67-70,共4页 Inner Mongolia Petrochemical Industry
关键词 地面建设项目 HSE 过程安全 绩效 Field development HSE process safety Key HSE performance
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部