摘要
近年来黄河上游宁蒙河段主槽淤积,中小流量下水位明显抬高,洪涝灾害频发。通过建立黄河上游巴彦高勒到头道拐河段水沙数学模型,研究了不同水沙条件下该河段的累计排沙比和累计冲淤量,得到了来水来沙条件与输沙效果的相关关系,计算不同流量下优化输沙的临界含沙量。在此基础上,提出了河道输沙效率指标,得到了适合巴彦高勒至头道拐河段输沙的洪水流量与洪水冲沙历时。研究结果表明,巴彦高勒到头道拐河段水库调节宜采用10天作为冲刷的单位时间,即每次冲刷时间控制为10天,汛期采用多次冲刷,河道输沙效果较好。
Main channel of the Yellow River in Inner Mongolia reach is heavy silting in recent years,and the water level raised obviously during middle or small flow discharge,and the flood disasters take place frequently.In this paper,the water and sediment numerical model is established for study the reach from Bayangaole to Toudaoguai in the Yellow River.The cumulative sediment delivery rate and the cumulative erosion and deposition amount of the river under different water and sediment conditions are studied by the model.Besides,the relationship between the incoming water and sediment and sediment transport efficiency is established to calculate the critical sediment concentration under different flow discharge.Finally,the index of river sediment transport efficiency was provided,for the suitable flood discharge and flood duration from the Bayangaole to Toudaoguai reach.Results show that the flushing period should be 10 days in Bayangaole to Toudaoguai reach during the reservoir operation.
作者
申孙平
吴腾
李涛
曲少军
SHEN Sun-ping;WU Teng;LI Tao;QU Shao-jun(Key Laboratory of Coastal Disaster and Defence,Ministry of Education,Hohai University,Nanjing210098,China;College of Harbor,Coastal and Offshore Engineering,Hohai University,Nanjing210098,China;Yellow River Institute of Hydraulic Research,Zhengzhou450003,China)
出处
《泥沙研究》
CSCD
北大核心
2019年第3期53-59,共7页
Journal of Sediment Research
基金
国家重点研发计划项目(2016YFC0402506)
国家自然科学基金项目(51509074
51679103
51509100)
中央高校业务费项目(2019B12114)
关键词
数学模型
水库调度
排沙比
冲淤量
numerical model
reservoir operation
sediment delivery rate
erosion and deposition amount