摘要
岭澳核电站辅助蒸汽系统优化设计方案,是核电站辅助蒸汽系统设计的首次尝试,该方案在分析了大亚湾核电站辅助蒸汽系统存在的问题后,考虑到两核电站间的资源共享问题,最终确定岭澳核电站辅助蒸汽系统采用1条联网管加1台电锅炉的辅助蒸汽供汽方案。文章主要介绍了该优化设计过程中所遇到各种问题及其解决方法。
The optimal design scheme for supplementary vapour system of Lingao Nuclear Power Station is the first of its kind at home and abroad. With the analysis of the problems in the supplementary vapor system of Daya Bay Nuclear Power Station,and in consideration of resource sharing between the two stations,a connecting pipe and an electric boiler are designed to be used in the supplementary vapour system of Lingao Nuclear Power Station. Problems encountered in the course of the design and their solutions are described in this paper.
出处
《广东电力》
2003年第2期56-58,共3页
Guangdong Electric Power
关键词
岭澳核电站
辅助蒸汽系统
优化设计
蒸汽转换器系统
锅炉
nuclear power plant
supplementary vapour system
connecting pipe
electric boiler
optimal design