摘要 广州发电厂1号汽轮机在一次甩负荷试验中发现该机组甩全负荷动态特性不合格,转速飞升过高。主要原因是电超速保护系统的设计存有缺陷,高压油动机动作延迟。针对这种情况,进行了相应的改造,在高压油动机两侧机底各加装两个电磁阀,加快了甩负荷过程中汽门的关闭。改造后,经过多年的考验,运行稳定可靠。这种方法可应用于同类型机组中。 Unit 1 steam turbine in Guangzhou Power Plant did not pass the fullload rejection test,the wheeling speed raised too much higher. The accident was mainly due to the defect in the design of electric overspeed protection,the response of HP oilpower machinery deferred much longer. Consequently,the according retrofit was carried out and two electromagnetic valves were added on every side of the HP oilpower machinery to accelerate valve closing during load rejection. Satisfactory operation results were obtained after the retrofit. This way can be used in the same type steam turbine.
作者 付新河
机构地区 广州发电厂
出处 《广东电力》 2003年第2期59-62,共4页 Guangdong Electric Power
关键词 汽轮机 电超速保护系统 技术改进 电磁阀 调节系统 广州发电厂 steam turbine load rejection electric over-speed protection speed control relay electromagnetic valve
  • 相关文献

参考文献3

  • 1.ZBK54 037--1990.汽轮机调节系统技术条件[S].,..
  • 2上海汽轮机厂.50 000 kW工业抽汽凝汽式汽轮机调节及保安系统说明书[Z].上海:上海汽轮机厂,1990..
  • 3周绍英.电力拖动[M].北京:冶金工业出版社,1989..

同被引文献8

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部