水电工程土建合同变更索赔的风险分析及对策 被引量:5

Changes and Risks for Claims in Contracts for Hydro Civil Works
下载PDF
导出
摘要 水利水电枢枢纽工程是一项综合性的系统工程,其特点是专业多、技术要求高、水文地质情况复杂、工期长,在工程实施过程中,出现设计修改(如工程量和工程项目的增减及技术标准的变更等),或者因为外部环境的变异、施工措施的变化、突发性不可抗力的事件、合同管理失调及非承包责任而为完成合同必须增加费用,为此。 Water resource and hydro project is generally complicated and systematic works, dealing with wide disciplines, sophisticated technologies, especially complex and unanticipated hydrological and geological conditions. Risks for claims resulting from changes to contract conditions may be unavoidable and could not be set by certain modes due to their complexity and uncertainty. These risks, however, and corresponding economic loss can be prevented and mitigated as far as possible through scientific analysis and careful treatment of risks at different contractual stages.
作者 蔡定国
机构地区 中国三峡总公司
出处 《中国三峡建设》 2003年第3期22-25,27,共5页 China Three Gorges Construction
关键词 水电工程 土建 索赔 风险分析 合同管理 工程造价 risk claim contract analysis hydro project.
  • 相关文献

同被引文献9

引证文献5

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部