摘要
采用全断面隧洞掘进机(TBM)施工方法快速、安全、效率高,但在特殊地质条件下所遇到的困难也是难以想象的。本文就山西省万家寨引黄工程施工中断层破碎带、蠕变岩体、溶洞、富水洞段等特殊地质条件下TBM施工进行了说明,可供同类工程参考和借鉴。
Some technological measures taken for construction of TBM in tunnels of Wanjiazhai YRDP(Yellow River Diversion Project)under special geologic condition such as the fault fractured zone,the creep rock mass,the karst cave and the watery zone are described respectively in this paper.
出处
《山西水利科技》
2003年第2期33-35,共3页
Shanxi Hydrotechnics