工期与收益的最优化模型

Optimization Model of the Time Limit for a Project and Proceeds
原文传递
导出
摘要 运用经济学原理及最优决策方案 ,建立了如何选择最优工期和制定奖惩措施的动态优化模型 .利用泛函变分法求出在各种情况下的最优工期 ,并确定出影响最优工期的各种因素 ;然后确定出使双方都有利的激励强度 ;最后利用计算机对模型进行了模拟分析 ,并对结果给出了详细的分析 . Economic principle and classic decision-making scheme are used, the dynamic optimize model of how to choose the optimize time limit for a project and how to design rewards and punishment measure are found. The optimize time limit for a project at any time is gained with the functional metamorphic method, and all kinds of factor of affecting the optimize time limit for a project is ensured. Then the invigorative intensity of making for both sides is confirmed. Lastly the model is simulated and analyzed by computer, and the result is detailedly analyzed.
作者 兰恒友
出处 《数学的实践与认识》 CSCD 北大核心 2003年第5期1-7,共7页 Mathematics in Practice and Theory
关键词 动态优化模型 最优决策方案 工期 收益 激励强度 泛函变分法 承包商 资源约束问题 现金流优化问题 optimize time limit for a project metamorphic method functional extremum invigorative intensity
  • 相关文献

参考文献4

  • 1汪嘉旻,孙永广,吴宗鑫.现金流优化的网络进度计划问题研究综述[J].系统工程,1999,17(2):1-7. 被引量:8
  • 2BraunM著 张鸿林译.微分方程及其应用[M].北京:人民教育出版社,1980..
  • 3王树禾.数学模型基础[M].合肥:中国科学技术大学出版社,1995..
  • 4中国数学会《数学的实践与认识》编委会.数学的实践与认识,2000,30(1).

二级参考文献6

  • 1冯允成.活动网络技术[M].北京:北京航空航天大学出版社,1991..
  • 2Yang K K,European Operational Research,1995年,85卷,327页
  • 3Zhu D,The Impact of Emerging Technologies on Computer Science and Operations Research,1995年,297页
  • 4Sung C S,International J Production Economics,1994年,37卷,177页
  • 5Yang K K,European Operational Research,1992年,64卷,188页
  • 6冯允成,活动网络技术,1991年

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部