摘要
针对焦作粘土矿选煤厂原煤在堆放和装卸过程中粉尘污染严重超标的实际情况 ,选择以管路喷洒降尘为主的治理方案 ,进行了方案设计 。
In view of the serious pollution caused by the dust produced during the raw coal piling up and loading unloading,a dust control scheme taking the water pipe line spraying to depress dust as its main content was selected and designed and the measures for safe operation were given.
出处
《金属矿山》
CAS
北大核心
2003年第6期60-62,共3页
Metal Mine