摘要
黄河下游河道的输沙能力是冲积河流随来水来沙自动调整的结果。黄河下游输沙用水总量是黄河下游河道这种自动调整水沙关系的宏观表现。作者通过对 1 949~ 1 95 3年黄河下游主要水文站实测资料的分析 ,找到黄河下游最小输沙水量 ,据此估算了黄河下游在小浪底水库投入运行后 2
The sediment transport capacity in the Lower Yellow River channel is capable of self adjustment according to the incoming water discharge and sediment content. The total water requirement for sediment transport in the Lower Yellow River is the reflection of this self adjustment. In this paper, the minimum water requirement for sediment transport in the river has been analyzed by using field data collected at several stations during 1949~1953 Based on this analysis, minimum total annual water requirement for sediment transport in the Lower Yellow River has been estimated for a 20 year period after Xiaolangdi Project is completed.
出处
《泥沙研究》
CSCD
北大核心
2003年第2期60-64,共5页
Journal of Sediment Research
基金
国家重点基础研究发展规划 ( 973 )资助项目 (G19990 43 6)
清华大学"985"校级重点科研项目软课题资助项目
关键词
黄河
最小输沙水量
汛期
小浪底水库
输沙能力
the Lower Yellow River
flood season
total water requirement for sediment transport
water requirement for sediment transport
Xiaolangdi Project