摘要
文章针对为海洋钻机配套的JJ450型井架的生产,提出了比较合理的生产工艺,解决了井架生产过程中下段的定位安装,井架体段与段的贴合度及井架体组装过程中变形的预防与修理,井架体与井架下段的装配验证等问题。
The paper establishes reasonable procedures for manufacturing the newtype mast to complete the offshore drilling rig and solves such problems as positioning and installing the bottom sections, fitting the sections concerned of the mast stem and preventing and handling the deformations occurring during the assembling of the mast stem,and also the verification of the assembly of the mast stem and its bottom sections.
出处
《石油矿场机械》
北大核心
2003年第3期63-65,共3页
Oil Field Equipment
关键词
海洋
钻机
井架
定位安装
制造
变形
offshore
drilling rig
mast
positioning & installing
manufacture
deformation.