期刊文献+

禹门口提水灌区工程边山渠道设计浅探

Probe into the Design of Hillside Channels in Yumenkou Water-Lift Irrigation Areas
下载PDF
导出
摘要 1995年夏季河津市龙门山麓发生特大暴雨,山洪暴发,致使黄河禹门口提水工程二级干渠河津段部分渠道和建筑物遭受破坏。文章在分析该工程发生水毁原因和处理措施的基础上,提出了对边山渠道几个设计问题的见解。 In the summer of 1995, an extraordinary rainstorm happened on the foot of Longmen Mountain, which caused the floodwaters rush down from the mountain and made some channels and buildings in Hejin Section of Second Level Trunk Canal of Yellow River's Yumenkou Water-Lift engineering be damaged. Based on analysis of the causes that the water-damagement occurred in the engineering and on the treating measures, this paper puts forward some opinions about several problems of the design of hillside channels.
作者 贺红效
出处 《科技情报开发与经济》 2003年第6期99-100,共2页 Sci-Tech Information Development & Economy
关键词 提水灌区工程 边山渠道设计 山洪 水毁 water-lift irrigation engineering design of hillside channel floodwater water-damagement
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部