摘要
山西晋城煤业集团古书院矿东翼材料暗斜井大断面绞车硐室 ,在施工中用数学方法解决了画轮廓线的难题 ,减少了高处作业搭、拆施工平台工序 ,保证了施工正规循环作业 。
By mathematics mehtods in Jincheng Gushuyuan coal mine construction,to resolve the problems drawed winch cave out line,reduces work process,ensures normal circulation operation of construction,to achieve the better economic and technical results.
出处
《山西焦煤科技》
2003年第1期31-32,共2页
Shanxi Coking Coal Science & Technology