摘要
某船主电站由于增容改装 ,要求相应地对发电机励磁系统进行改造。文章给出了改造方案 ,根据改造方案 ,建立了全系统模拟试验系统。系统的模拟试验结果表明 ,该改造方案可以满足主电站增容以后的各项性能指标 。
In order to carry out power capacity enhancing program in some power station,the alteration to the exciting system of its corresponding generator is required.This paper introduces the alteration project,based on the alteration project;the simulation experiment system for whole system is established.The results of simulation experiment on the system indicate the project can fulfill the performance target of the power station and provides a kind of evidence for actual program.
出处
《中国修船》
2003年第3期12-16,共5页
China Shiprepair