土石过水围堰过水期最不利工况及其流量确定 被引量:22

Determination of the worst operating condition and discharge of overtopped cofferdam during construction stage
下载PDF
导出
摘要 本文系统分析了影响土石过水围堰溢流工况的主要因素 ,提出衡量最不利工况的指标和确定最不利流量的方法 ,为土石过水围堰堰体下游护坡结构及消能防冲设施设计提供了理论依据。通过理论计算结果与模型试验现场观测资料数据对比分析 。 Factors affecting the operating condition of earth rock overtopped cofferdam was systematically analyzed. A method was worked out for measuring the worst operating condition and determining the worst discharge of overtopped cofferdam during construction stage. The results provide theoretical basis and method selecting overflow discharge for the downstream slope protection structure, energy dissipation and reosion control facilities. Comparison with the results of theoretical calculation and model examination shows the method presented herein is reasonable.
出处 《水动力学研究与进展(A辑)》 CSCD 北大核心 2003年第3期266-270,共5页 Chinese Journal of Hydrodynamics
基金 国家自然科学基金资助项目 ( 5 0 0 790 17)
关键词 土石过水围堰 最不利工况 施工导流 可靠性分析 抗冲流速 过水期 流量 construction diversion earth rock overtopped cofferdam relliability analysis resistant current velocity
  • 相关文献

参考文献4

二级参考文献1

  • 1夏明耀.国外过水堆石围堰块石护面试验研究情况介绍[J]水力发电,1981(07).

共引文献24

同被引文献107

引证文献22

二级引证文献61

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部