摘要
介绍了太阳大厦工程深基坑围护工程施工的概况及其地质条件 ,阐述了方案的比较及选定过程 ,提出了方案的优化措施 。
The general situations of deep excavation retaining work and its geological conditions in Sun Mansion work are introduced. The scheme alternative selection process is elaborated. Meanwhile, some optimization measures are proposed and detailed exposition is made for scheme implementation.
出处
《山西建筑》
2003年第6期54-55,共2页
Shanxi Architecture