摘要
对焦化工程结构变化进行了分析 ,从部署总体施工网络工序的施工顺序方面进行了论述 ,对焦化工程的各施工工序充分研究 。
Based upon analysis of diversified structures in coking project the construction process is discussed from general network construction design. And through fully research on every construction stage the determination of construction program of coking project is solved.
出处
《山西建筑》
2003年第6期102-103,共2页
Shanxi Architecture