摘要
介绍福宁高速公路八尺门大桥主墩承台施工概况 ,阐述了其施工方案 ,提出了具体施工工艺流程 ,并对重点施工技术进行了详细说明 ,经实践 ,此方案安全可行。
In this paper the construction situation of the prime tower platform in cross sea bridge of Bachimen is introduced. The construction scheme is elaborated and concrete technological process is proposed, especially for major construction technique detailed exposition is made. In the end the feasibility of this scheme is verified by practice.
出处
《山西建筑》
2003年第6期251-252,共2页
Shanxi Architecture