摘要
结合具体工程实例 ,叙述了高压旋喷桩加钢筋和深层搅拌 (浆喷 )加竹筋的设计方案及施工管理措施和质量保证措施。该方案在实施中完全满足支护工程边坡稳定的要求 。
By combining with concrete example of engineering, the design scheme and measures of construction management and quality ensuring measures of high pressure churning piles and deep mixed piles (pneumatic mortar) are expounded. Observation shows this scheme can meet requirement of the slope stability, and supply the advantageous condition for the succeeding construction.
出处
《太原科技》
2003年第3期64-65,共2页
Taiyuan Science and Technology
基金
山西坚石基础工程有限公司 2 0 0 0年重点研究课题
关键词
基坑支护
加筋水泥土挡墙
施工管理
粉喷桩
高压旋喷桩
high pressure churning piles, pneumatic mortar piles, reinforced cement-soil retaining wall, foundation pits shoring, design scheme, construction management