期刊文献+

除磷脱氮SBR系统的污泥特性分析 被引量:1

Analysis on Sludge Characteristics of SBR for Phosphorus and Nitrogen Removal System
下载PDF
导出
摘要  通过对除磷脱氮SBR系统活性污泥性能及活性的研究,认为该系统特有的物质转化方式是导致活性污泥的性能发生周期性变化的主要原因。试验结果表明,单位体积混合液中好氧污泥比厌氧污泥浓度低,好氧污泥中挥发性固体物质的比例比厌氧污泥低;在间歇曝气系统中分子氧的不连续输入使氧化酶传递氧的过程受阻,导致耗氧呼吸速率(SOUR)和脱氢酶活性具有不同的变化规律:前者在厌氧段增加而在好氧段减小,后者在好氧段增加而在缺氧段减小。 By means of the study on activated sludge characteristics and activity in SBR for phosphorus and nitrogen removal system, it was believed that the material translation type inherent in the system was the main reason why the periodic variation took place for activated sludge characteristics. The test result showed that MLSS of aerobic sludge is lower than anaerobic sludge and the ratio of MLVSS/MLSS in aerobic sludge is lower than that in anaerobic sludge. In the intermittent aeration system, the discontinuous input of molecular oxygen hinders the oxygen transfer process of oxidase, which leads to the different variation regularity in specific oxygen uptake rate (SOUR) and activity of dehydrogenase: the former is increased in anaerobic stage and decreased in aerobic stage; the latter is increased in aerobic stage and decreased in anaerobic stage.
出处 《中国给水排水》 CAS CSCD 北大核心 2003年第6期16-19,共4页 China Water & Wastewater
基金 国家自然科学基金资助项目(50278101) 重庆大学骨干教师资助计划项目(1-57)
关键词 生物除磷 污泥特性 SOUR 脱氢酶活性 SBR系统 biological phosphorus removal sludge characteristics SOUR activity of dehydrogenase SBR system
  • 相关文献

参考文献2

二级参考文献2

共引文献94

同被引文献10

  • 1吉芳英,罗固源.排出厌氧富磷污水生物化学除磷脱氮ERP-SBR系统研究[J].水处理技术,2005,31(1):57-61. 被引量:20
  • 2国家城市给水排水工程技术研究中心译.污水生物与化学处理技术[M].北京:中国建筑工业出版社,1999..
  • 3郑兴灿,李亚新.污水除磷脱氮技术(第1版).北京:中国建筑工业出版社,1996.
  • 4国家环境保护总局《水和废水监测分析方法》编委会编.水和废水监测分析方法(第4版).北京:中国环境科学出版社,2002.
  • 5Smolders G.J.F.,Van Loosdrechl M.C.M.,Heijnen J.J.Steady state analysis to evaluate the phosphate removal capacity and acetate requirement of biological phosphorus removing mainstream and sidestream process configurations.Wat.Res.,1996,30(11):2748 ~ 2756.
  • 6Morgenroth E.,Wilderer P.A.Modeling of enhanced biological phosphorus removal in a sequencing batch biofilm reactor.Wat.Sci.Tech.,1998,37 (4 ~ 5):583 ~ 587.
  • 7Pitman A.R.Design considerations for nutrient removal activated sludge plants.Wat.Sci.Tech.,1991,23 (4 ~6):781 ~790.
  • 8Randall C.W.,Barnard J.L.,Stensel H.D.Des and retrofit of wastewater treatment plants for biological nutrient removal.Lancaster:Technomic Publishing,1992.
  • 9华光辉,张波.城市污水生物除磷脱氮工艺中的矛盾关系及对策[J].给水排水,2000,26(12):1-4. 被引量:114
  • 10夏世斌,刘俊新.立体循环一体化氧化沟处理城市污水研究[J].中国给水排水,2002,18(6):1-4. 被引量:28

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部