期刊文献+

三维快速拉格朗日法进行水布垭地下厂房的稳定分析 被引量:42

ANALYSIS ON STABILITY OF SURROUNDING ROCKS OF SHUIBUYA UNDERGROUND PLANT BY THREE-DIMENSIONAL FAST LAGRANGIAN METHOD
下载PDF
导出
摘要 选取清江水布垭水利枢纽工程地下厂房区,采用三维快速拉格朗日法(FLAC-3D),模拟施工开挖过程,研究了复杂地质条件下洞室群围岩的开挖变形形态与应力状态,分析了围岩塑性区分布及地下厂房洞室群围岩的稳定性,并对尾水洞顶拱进行了加固处理。 The construction and excavation process of underground plant of the Shuibuya Project are simulated by three-dimensional fast Lagrangian method(FLAC-3D). The pattern of deformation caused by excavation and stress state in surrounding rocks of the chamber group under complex geological conditions are researched. The distribution of plastic areas and the stability of surrounding rocks are analyzed. And the bolting is performed to support the vault of tail-race tubes.
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2003年第7期1047-1053,共7页 Chinese Journal of Rock Mechanics and Engineering
基金 国家自然科学基金(59939190)
关键词 水利枢纽工程 地下工程 地下厂房 围岩稳定 喷锚加固 FLAC Deformation Excavation Rock bolting Stability
  • 相关文献

参考文献11

二级参考文献27

共引文献454

同被引文献259

引证文献42

二级引证文献449

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部