摘要
介绍了冶金企业高温铁水过轨运输的技术要求、过轨运输车的方案确定、保温系统的研制与设备的加固等。
Described are the technical requirements on the transport by track for high temperature molten iron of metallurgical enterprises, the determination of the scheme of cars for transport by track, development of thermal insulation system and securing of equipment, et al.
出处
《铁道车辆》
2003年第7期8-11,共4页
Rolling Stock