期刊文献+

Flow-shop调度问题的自适应模拟退火算法 被引量:5

Adaptive simulated annealing algorithm for flow-shop scheduling problem
下载PDF
导出
摘要 为求得一个强NP-难问题——flow-shop调度问题的最优解或近优解,提出一种自适应模拟退火算法。本算法采用一种基于区段特性的特殊邻域结构、简便的目标函数计算方法和自适应退火策略。通过Flow-shop调度问题的基准测试问题的实验,数值结果证实了该方法的有效性。 An adaptive simulated annealing algorithm is proposed for the optimal or sub-optimal solution of flow-shop scheduling problem. A special neighborhood structure based on block property, simple computed method of object function and an adaptive annealing strategy are adopted in the algorithm. The experiment shows the effectiveness of this algorithm.
出处 《控制理论与应用》 EI CAS CSCD 北大核心 2003年第3期445-448,453,共5页 Control Theory & Applications
基金 国家自然科学基金(69774032)
关键词 F1ow-shop调度问题 自适应模拟退火算法 启发式算法 运筹学 flow-shop scheduling adaptive simulated annealing algorithm heuristic
  • 相关文献

参考文献10

  • 1GAREY M R, JOHNSON D S, SETHI R. The complexity of flow shop and job shop scheduling [J ]. Mathematics of Operations Research, 1976, 1 (2) : 117 - 129.
  • 2LENSTRA J K, RINNOOY Kan AHG, BRUCKER P. Complexity of machine scheduling problems [ J ]. Annal of Discrete Mathematics,1977,1(1):343-362.
  • 3CAMPBELL H G, DUDEK R A, SMITH M L. A heuristic algorithm for the n-jobs, m-machine sequencing problem [ J]. Management Science, 1970,( 16):630-637.
  • 4NAWAZ M, EMSCORE Jr E E, HAM I. A heuristic algorithm for the n-job, m-machine flow shop sequencing problems [J]. Int J of Management Science, 1983, (11 ):91 - 98.
  • 5TAILLARD E.Some efficient heuristic methods for the flow shop seqencing problem [ J ]. European J of Operational Research, 1990,(47) : 65 - 74.
  • 6OSMAN I H, POTTS C N. Simulated annealing for permulation flow shop scheduling [ J]. Int J of Managemera Science, 1989, (17) :551 -557.
  • 7KIRKPATRICK S, GELATT C D Jr, VECCHI M P. Optimization by simulated annealing [J]. Science, 1983, (220) :671 - 680.
  • 8GRABOWSKI J, SKUBALSKA E, SMUTNICKI C. On flow shop scheduling with release and due dates to minimize maximum lateness[ J]. J of Operational Research Society, 1983, (4) :615 - 620.
  • 9GRABOWSKI J, NOWICKI E, ZDRALKA S. A block approach for single-machine scheduling with release dates and due dates .European J of Operational Research, 1986, (26) :278 - 285.
  • 10TAILLARD E. Benchmark for basic scheduling problems [J]. European J of Operational Research, 1993, (64) :278 - 285.

同被引文献40

引证文献5

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部