摘要
对湘潭电厂存在已久的胶球清洗装置收球率低的问题进行了深入探讨 ,结合电厂对胶球清洗系统的改造、试验过程 。
The problem of low rate of gluey ball collection in glue ball cleaning system exists in Xiangtan power plant for a long time.The causes of the problem are analyzed thoroughly in this paper. In combination with the retrofit of the cleaning system, some measures are proposed and carried out to improve the rate of glue ball collection.
出处
《湖南电力》
2003年第3期41-43,共3页
Hunan Electric Power