摘要
根据永乐电站引水隧洞施工的成功经验 。
According to the succssful experience in the construction of the tunnel in Yongle hydroelectric power station, the forecast methods and treatmeat measures of rock burst in high geological stress conditions in the construction of tunnel are introduced
出处
《石家庄铁道学院学报》
2003年第B07期34-36,共3页
Journal of Shijiazhuang Railway Institute