摘要
介绍了九江发电厂采用全三维方案对 1号机组通流部分进行改造的原因、目的及主要技术参数 ,对自行安装的主要施工步骤、改后热力试验、尚待改进的问题等也作了简单回顾。
The causes?purposes of using whole three dimensional plan to reform for NO.1 units part of flow path and its mainly techinical parameter?be installation and construction step by themseves. Some problems need be improved are put forward.
出处
《江西电力》
2003年第3期13-15,22,共4页
Jiangxi Electric Power
关键词
火电厂
汽轮机
通流部分
全三维气动设计
施工
改造
thermal power plant
turbine
flow path's part whole three-dimensional air controlled design
construction
security economy