高压换热器的热处理 被引量:1

Heat Treatment of H.P.Heat Exchanger
下载PDF
导出
摘要 按设备制造规范和工程设计标准、图样要求 ,结合生产实际 ,制订出高压换热器球形封头热成形加热及热处理工艺、焊前进炉预热工艺、焊后热处理工艺、最终合拢缝局部焊后热处理工艺、最后做出经验总结 ,作为今后尿素高压设备热处理的参考。 According to the fabrication code, engineering design standards, drawing technical specifications, and combining with the workshop actual state, the procedure or (and) method of hot shaping heat & heat treatment of spherical heads, preheating in furnace before welding, P.W.H.T. and local P.W.H.T. of closing welds of H.P. heat exchanger were presented in this paper. In more detailed way, the local P.W.H.T. of the closing welds between spherical heads and H.P. channels was specified. And before local P.W.H.T. the procedure qualification test was introduced in order to prove that it was no bad affect to the corrosion resistant property of X2CrNiMo25-22-2 line of channels and overlay of heads resulted from the heating during local P.W.H.T.. At last , the experience conclusions were given. These may be used as reference for heat treatment procedures for (NH 2) 2CO high pressure vessels.
出处 《压力容器》 2003年第6期51-55,共5页 Pressure Vessel Technology
关键词 热处理 高压换热器 heat treatment H.P. heat exchanger
  • 相关文献

参考文献10

  • 1殷为玉.Jo-247(Ⅳ)《尿素工厂不锈钢衬里高压热交换器制造技术条件》[M].中国五环化学工程公司,2001..
  • 2张向阳.C10—A15E-95《尿素工厂高压汽提塔、高压冷凝器、高压洗涤器工程采购说明书》[M].中国五环化学工程公司,1995..
  • 3孙德元.14-A32S--95《尿素厂X2CrNiMo25—22—2不锈钢的材料要求》[M].中国五环化学工程公司,1996..
  • 4.DIN17155.《耐热钢和钢带交货技术条件》.德国国家标准[S].,1983..
  • 5张时中.GB10477—89《尿素二氧化碳汽提塔技术条件》[M].中国标准出版社,1989..
  • 6张向阳.D10—A15E—95《尿素合成塔采购说明书》[M].中国五环化学工程公司,1995..
  • 7孙德元.30-AlOS--95《尿素厂316L mod不锈钢的材料要求》[M].中国五环化学工程公司,1996..
  • 8殷为玉.Jo-306(Ⅳ)《不锈钢衬里尿素合成塔制造技术条件》[M].中国五环化学工程公司,2001..
  • 9孙德元.8-A9S-95《尿素厂耐腐蚀不锈钢的休氏试验和金相检验的取样》[M].中国五环化学工程公司,1996..
  • 10孙德元.8-A10S-95《尿素厂耐腐蚀不锈钢的休氏试验和金相检验》[M].中国五环化学工程公司,1995..

同被引文献9

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部