摘要
文章结合通辽电厂水源工程,详细论述了GPS和水准测量相结合的基本原理及工作方法,并得出了有益的结论,对今后类似的工程具有一定的借鉴作用。
According to Tongliao power plant water source engineering,it particular discuss basis theory and means of combine of GPS and leveling survey,availability results is obtained.it has got use for reference for the same engineering in the future.
出处
《电力勘测设计》
2003年第2期40-42,共3页
Electric Power Survey & Design