禹州电厂发变组保护及厂用电快切装置的调试 被引量:1

Test and Adjustment of Generator-transformer Unit Protection and Auxiliary Power Fast Switch off Device in Yuzhou Power Plant
原文传递
导出
摘要 禹州电厂 2× 30 0MW机组发变组保护均采用ABB公司最新微机型保护设备 ,其厂用电备用自投装置采用微机型快切装置。这 2种保护装置都具有鲜明的特点 ,逻辑功能强大 ,工作方式灵活 ,具备网络一体化水平 ,其调试方法也比较新颖 。 The generator-transformer unit protection for 2×300 MW units in Yuzhou Power Plant is the up date micro-computer protection produced by ABB company and the standby auto-put-in device of its auxiliary power is also the micro-computer fast switching off device. These two protective devices have distinct characters, including strong logic functions, flexible operation mode and network integrative level. Its test and adjustment method is also relatively novel, which can be as a reference for other power plants. [
出处 《电力建设》 北大核心 2003年第6期47-49,共3页 Electric Power Construction
关键词 禹州电厂 发电机组 变压器组 保护装置 厂用电系统 快切装置 调试 generator-transformer unit micro-computer protection auxiliary power micro-computer fast switching off device
  • 相关文献

同被引文献11

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部