发电厂同期接线设计的新尝试 被引量:2

A New Sample of Simultaneous Wiring Design of Power Plant
下载PDF
导出
摘要 为实现发电厂、变电站全部断路器的操作自动化 ,采用 SID- 2 CM型发电机线路复用自动同期装置与 SID- 2 X型多同期点共用同期装置自动选线器配合 ,实现了太原第二热电厂 9号机的发 -变 -线组断路器、高厂变低压侧 6 k V工作分支断路器、启备变低压侧 6 k V备用分支断路器接受 DCS的全自动控制设计。 It order to realize operation automation of all the breakers of the power plant and the transformer substation,our academy adopt Model SID-2CM complex automation synchronization device for generator and line and Model SID-2X automatic line selection device of synchronization device for multi-point.The sample on Taiyuan second heat power plant is a good example.Its generator-transformer-line unit breakers of the No.9 generator,the work branch breakers inclined to low-tension of high-voltage hose service transformer at 6 kV,restrored branch breakers inclined below-tension of start and reserve transformer at 6 kV have been accepted as automatically control designing completely of DCS.
作者 赵燕茹
出处 《山西电力》 2003年第3期48-51,共4页 Shanxi Electric Power
关键词 发电厂 发电机 电力系统 电网 同期装置 接线设计 shut ring power-angle parallel power flow automatic line selection device
  • 相关文献

同被引文献21

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部