摘要
介绍了河津电厂汽轮发电机组甩负荷试验 ,成功地实现汽轮机甩负荷小岛运行方式 ;试验结果表明汽轮机调节系统动态特性满足运行要求 ,以及实现汽轮机小岛运行对大型机组运行的重要性。
This test introduces turbine unit of HEJIN Power Plant load rejection experiment,and successfully realizes unit load-rejection-island operation method;It is on trial to express that turbine group for regulation system dynamic characteristic satisfy operation request,and it is important to great turbine unit.
出处
《山西电力》
2003年第3期57-60,共4页
Shanxi Electric Power