摘要
新建的无锡电视塔位于惠山二茅峰峰顶,由于受地理环境及交通运输等影响,电视塔钢构架的安装施工比较困难。为此,施工单位采用散件安装与整体提升相结合的方法,顺利地完成了这一施工任务。
Wuxi No.2 TV Tower erected newly is located at the top of Hui Hill. Its erection is much more difficult for its geographical surroundings and transportation. Therefore, the construction firm adopted an installationhoisting method so that this project was completed successfully.