介绍了蒲城1号汽轮机DEH系统改造后主汽阀及调节汽阀关闭时间测定试验,针对中压调节汽阀关闭时间较长的问题进行了相关分析,提出了处理意见。
Main steam valve & regulation valve closing time test is introduced after DEH system retrofit in No. 1 unit, Pucheng Power Station. Related analysis is conducted in the light of long-time MP regulation valve closing time. Treatment suggestion is put forward.