摘要
小浪底工程进水塔属于世界上最复杂的进水口 ,共布置了 98个闸门。闸门槽二期混凝土施工具有施工空间狭窄、悬空高度较大、施工部位分散、施工干扰大、工期要求紧等特点 ,这在以往的水电施工中是不曾有的。在施工过程中 ,通过采用新型施工工艺和先进的施工设备 ,成功的解决了所遇到的难题 。
The Xiaolangdi water control project has the most complicated water intakes in the world, provided with 98 gates. The construction of stage Ⅱ concrete for gate slots is unprecedented due to its limited space, suspending height, scattered positions, severe interference and urgent construction period. By adopting new construction technology and advanced equipment, the problems encountered in its construction are successfully addressed and its construction is completed smoothly.
出处
《西北水电》
2003年第2期6-7,26,共3页
Northwest Hydropower