摘要
预应力混凝土空心板的施工及质量控制有待进行积极的探索 ,结合多年的施工实践 ,就预应力混凝土空心板底模制作、钢筋网及预应力管道的预留等施工工序进行了介绍 。
The construction and quality control of prestressed concrete hollow slab subject to study. In this paper combined with several years' experiences in construction detailed introduction is made on the fabrication of bottom die, mesh reinforcement and prepared construction of prestressed pipe. Meanwhile, corresponding quality control measures are proposed.
出处
《山西建筑》
2003年第7期210-211,共2页
Shanxi Architecture